We Built the Destroyed Part of the Zahišar Homestead -
Main Staps of the Construction
2005, 2 pictures
Božo Before Putting of the Foundation Stone
Here will grow "a nice house"!
Before Starting, the 1st Picture
View on "snag" between the bridge passage and neighboring house,
25th September 2005.
Before Starting, the 2nd Picture
View on "snagged" Goranji Konc, 25th September 2005.
Beginning, the 1st Picture
Izidor was digging with a machine and Igor with a shovel, 5th, January, 2006.
Beginning, the 2nd Picture
"Calm consultation" between Zoran and undersigned, 5th, January, 2006.
Luck Among Felling Marl
During the digging with a machine, due to vibrationa and inclination of fissures
around 5 m3 of marl collapsed.
Fortunately without consequences.
Foundation Plate
At the end of the month in spite of the severe winter foundation plate
was finished,
31st, January 2006.
In the second half of February under the bridge passage foundation wall
was done and the first part of groundfloor plate
was finished,
25th, February 2006.
The 2nd Part of Groundfloor Plate
The groundfloor plate was finished,
3rd, March, 2006.
Plate of the 1st Ploor
The plate of the first floor was finished,
26th, March, 2006.
Plate of the Loft Space
The plate of the second floor was finished,
Zoran, Osman, Miran and Katja, 13th April, 2006.
The First Beams
View to
the Zahišar homestead, 11th May, 2006 afternoon.
Between Sky and Earth
To work on the roof is not for everyone, 16th May, 2006 morning.
Roof on Thursday, 18th May, 2006, Morning,
Penthouse was
covered with bricks painted with large diamonds.
Bricks needed to strengthen on the upper side
with net and glue, because the roof is occasionally
exposed to the storm winds, which in gusts reaching
speed more than 200 km per hour. Then the bricks shake and
some droped.
Roof on Thursday, 18th May, 2006 Morning,
Roof on Saturday, 20th May, 2006 Morning,
On Friday insulating plates were covered with water resistant, but breathable fabric.
Roof on Saturday, 20th May, 2006 Morning,
Zoran removing planks of the fence that would not be broken by strong wind.
Roof on Saturday, 4th June, 2006 Morning,
Bird's view on the roof.
Roof on Sunday, 11th June, 2006 Morning,
New roof is recognised by oval windows below it.
View Wrom not Covered Subway on Saturday, 24th June, 2006 Afternoon
Impression of great height of the house beneath the surface of the square is no longer possible.
View from Street Towards Old Part of the House, Saturday, 1th July, 2006 at Noon
Goranji Konc, Monday, 10th July, 2006 Afternoon
2006, 27 + 8 (ptk) pictures
2007, 1 picture
2008, 2 pictures
2012, 3 pictures
All of the pictures are 600 x 450 pixels in size,
except the last five (800 x 600 pixels).
Photo and (c)
Daniel Rojšek, Danč, 2005-2024.
Situation on the 6th, January 2006.
The 1st Part of Groundfloor Plate
View Towards Goranji Konc
View Towards Sea
View Towards Goranji Konc
View Towards Sea
View Towards Sea
Photographed by Zoran Simčič.
View Towards Sea
Subway, 10th July, 2006
View below the square towards basement of the new part of the house.
Small Spruce on Thursday, 20th July, 2006 Evening, the 1st Picture
There is no good construction party without spruce in Slovenija.
Small Spruce on Thursday, 20th July, 2006 Evening, the 2nd Picture
Final preparations for construction party.
View from the window in the roof to the setting sun.
Closed Windows and Entrances on Sunday, 22th July, 2006 Evening,
the 1st Picture
Katja and me closed windows in groundflor and entrances after the party.
View to the lower part of the house.
Closed Windows and Entrances on Sunday, 22th July, 2006 Evening,
the 2nd Picture
View to the upper part of the house.
A little rest was valuable.
The First Stone Window Frame
Too much rest can also be harmful.
The frames arrived at the end of the year 2006,
the first one was in place on 28th May, 2007.
All the Frames in Place
The last arched part of the framework was in place on Friday 20th July, 2007.
Rock Wool
In a little while house would be "dressed" in the 8 cm thick layer of rock wool, Friday, 8th February 2008.
Plaster
Walls were covered with breathable lime plaster, Thursday, 13th March, 2008.
New Floors - the First Picture
At Goranji Konc,
Saturday, 29th June, 2012.
At the lower street, Saturday, 29th June, 2012.
View from the lower street through bridge passage to the Goranji Konc,
Saturday, 29th June, 2012.
The page from 2nd March, 2013 by
Daniel Rojšek, Danč.
New Floors - the Second Picture
New Floors - the Third Picture
Your
comments
are welcome.