Slovensko We Built Up Removed Part of the Zahišar Homestead,
Before Starting, Excavation, Foundations and Basement


2005, 2 pictures and
2006, 10 pictures,
all of them are 600 x 450 pixels in size.


Before we Started, the 1st Picture


The 1st view of the "stump" next to Zahišar's homestead, 25th September, 2005.


Before we Started, the 2nd Picture


The 2nd view of the "stump" next to Zahišar's homestead, 25th September, 2005.


The Beginning, the 1st Picture


Izidor was digging with a machine and Igor with a shovel, 5th January, 2006.


The Beginning, the 2nd Picture


Consultation between Zoran and the undersigned, 5th January, 2006.


Luck During an Accidental Collapse


During the digging with the machine, it collapsed around 5 m3 of marl. There was no one in the hole, 6th January, 2006.


  • Eight pictures from putting of the foundation stone


    The Foundation Plate, the 1st Picture


    At the end of the month, despite the severe winter, we poured the foundation plate, 31st January, 2006.


    The Foundation Plate, the 2nd Picture



    The Basement, 1st Picture


    The basement is getting its own look, 23rd February, 2006.


    The Basement, 2nd Picture



    Removing of Support


    After the 1976 earthquakes, concrete supports were built to prevent the bridge from collapsing. The black concrete was as hard as a rock during broking.
    Two Mirans and Jordan, 23rd February, 2006.




    The page from 10th March, 2013 by Daniel Rojšek, Danč.